top of page
Search

April 16, 2024 Thermfire Work Continues!

  • Writer: Brent Gudgeon
    Brent Gudgeon
  • Apr 16, 2024
  • 1 min read

Thermfires move from the fab shop to our assembly area.


(above) Chris assembling a water pump and filter assembly for a Thermfire System.

(above) Ancillary equipment sand hoppers painted and fitted with valves and level probes.

 
 
 

コメント


bottom of page